ما

لیزینگ fpso بازار modec bw

Projects | MODEC

Projects. MODEC is an owner/operator and EPCI (Engineering, Procurement, Construction and Installation) general contractor of floating production systems including Floating Production Storage and Offloading (FPSO) units, Floating Storage and Offloading (FSO) units, FLNGs, Tension Leg Platforms (TLPs) and Semi-Submersibles.

ادامه مطلب

BW Offshore set to steal Modec's thunder on Australia

Both floater companies were involved in the race for the Barossa FPSO prize, but Modec seemed to be holding all the cards after first emerging as the winner of …

ادامه مطلب

Gato do Mato FPSO has only two proponents

Gato do Mato FPSO has only two proponents. After some postponements, Shell receives proposals for the chartering of the production unit of its project in the Santos Basin. Modec and the BW Offshore / Saipem consortium submitted a technical proposal for Shell's bid for the chartering of the Gato do Mato FPSO. The delivery of commercial …

ادامه مطلب

FPSO Fluminense | Projects | MODEC

FPSO Fluminense. The Bijupirá and Salema oil fields development in the Campos Basin, offshore Brazil was the first full field, turnkey project undertaken by MODEC. MODEC executed the project for Shell under one single-point responsibility. The contract included the conversion of a ULCC tanker to an FPSO which is capable of processing 81,000 ...

ادامه مطلب

Proceeds with phased Maromba development and agreement to purchase FPSO

BW Energy has decided to proceed with the Maromba development project offshore Brazil and signed an agreement to purchase the FPSO Polvo from BW Offshore. The FPSO will be upgraded and redeployed on the field. The development plan is based on an initial drilling campaign of three wells with planned first oil in 2025 and a second …

ادامه مطلب

MODEC Unveils New FPSO Designs

Aug 2, 2019. The newly introduced MODEC NOAH (top) and M350 FPSO designs (Image: MODEC) Japanese floating production specialist MODEC has developed a pair of next generation new build hull designs for floating production, storage and offloading (FPSO) vessels developed in partnership with Mitsui E&S Shipbuilding, targeting greater …

ادامه مطلب

Modec bumped off by rival as Santos hands out Barossa

The FPSO will be built in South Korea and Singapore before being towed and permanently turret moored at the Barossa field, with BW providing a newbuild hull …

ادامه مطلب

FPSO Cidade de Campos dos Goytacazes MV29 | Projects | MODEC

SOFEC, Inc., a MODEC group company, designed and provided the spread mooring of the FPSO. Moored approximately 125 km from Macaé, State of Rio de Janeiro in the southeast coast of Brazil, in water depths of 765 m, the FPSO is capable of processing 150,000 barrels of crude oil per day, 176 million standard cubic feet of gas compression per day ...

ادامه مطلب

BW Offshore Nabs Coveted Barossa FPSO Contract

The Barossa FPSO will be built in South Korea and Singapore before being towed and permanently moored at the field where it will produce and process natural gas …

ادامه مطلب

OSX-3 FPSO | Projects | MODEC

The OSX-3 FPSO is utilized within block BM-C-39 of the Campos Basin, offshore Brazil, on the Waikiki Pero Inga fields. The FPSO is moored in approximately 110 meters water depth, have a storage capacity of 1.3 million barrels, be capable of processing 100,000 BOPD of heavy oil from the Campos Basin reservoir, generate approximately 60 MW of power, …

ادامه مطلب

Floating Production Systems | Business | MODEC

Floating Production Systems. MODEC is an owner/operator and EPCI (Engineering, Procurement, Construction and Installation) general contractor of floating production systems including Floating Production Storage and Offloading (FPSO) units, Floating Storage and Offloading (FSO) units, FLNGs, Tension Leg Platforms (TLPs) and Semi …

ادامه مطلب

BW Offshore | BW Offshore

BW Offshore has completed 40 FPSO and FSO conversions and operated most of the units after completion, developing a unique conversion and operating …

ادامه مطلب

BW Offshore: BW Catcher FPSO contract extended beyond …

BW Catcher FPSO contract extended beyond fixed term BW Catcher FPSO is owned and operated by BW Offshore and is leased out under a seven-year fixed term contract, with extension options for an ...

ادامه مطلب

FPSO Cidade de Santos MV20 | Projects | MODEC

This is the fifth vessel MODEC provides and operates in Brazil. It is the first FPSO that processes more gas than oil. The FPSO is installed in 1,300 m in water depth approximately 160 km from Rio de Janeiro city. The contract is a 12 year lease with 3 one-year extension options. Unit Name. FPSO Cidade de Santos MV20. Field. Urugua/Tambau field.

ادامه مطلب

United Kingdom FPSO Market Strategic Insight Survey With …

United Kingdom FPSO Market Strategic Insight Survey With Key Companies - Bumi Armada, BW Offshore, MODEC, CNOOC

ادامه مطلب

FPSO Carioca MV30 | Projects | MODEC

The FPSO Carioca MV30 is deployed for operations in the Sépia field operated by Petróleo Brasileiro S.A. (Petrobras), located in the giant "pre-salt" region of the Santos Basin some 200 kilometers off the coast of Rio de Janeiro, Brazil at a water depth approximately 2,200 meters.. MODEC was responsible for the engineering, procurement, construction, …

ادامه مطلب

MODEC at a Glance | About MODEC | MODEC

MODEC at a Glance. MODEC is an owner/operator and EPCI (Engineering, Procurement, Construction and Installation) general contractor of floating production systems including Floating Production Storage and Offloading (FPSO) units, Floating Storage and Offloading (FSO) units, FLNGs, Tension Leg Platforms (TLPs) and Semi-Submersibles.

ادامه مطلب

FPSO Baobab Ivoirien MV10 | Projects | MODEC

It is capable of processing 70,000 barrels of oil per day, 75 million cubic feet of natural gas, and 100,000 bpd of water injection. The facilities are designed and installed for ease of future in-situ expansion of topsides capacity. The Baobab FPSO came online in August 2005. MODEC operates the FPSO. Unit Name. FPSO Baobab Ivoirien MV10. Field.

ادامه مطلب

BW Offshore FPSO World | BW Offshore

Following process cooling, the heated cooling medium is cooled indirectly using coarse filtered seawater. The seawater is supplied using pumps within the FPSO hull or using caisson pumps located on the topsides, supported from the side of the FPSO. The seawater is drawn from the optimal sea depth, considering water temperature and quality.

ادامه مطلب

FPSO Market | Key Players

Press release - MRRSE PVT LTD - FPSO Market | Key Players - MODEC, Inc., SBM Offshore N.V., BW Offshore, Bluewater Energy Services B.V., Bumi Armada Berhad, Yinson Holdings Berhad | fpso market ...

ادامه مطلب

Signed contract for Barossa FPSO | BW Offshore

The Lease and Operate contract has a firm period of 15 years, with 10 years of options. The firm period contract value is USD 4.6 billion. BW Offshore will be responsible for engineering, procurement, construction, installation, and operation of the FPSO. The Final Investment Decision (FID) was confirmed by Santos and its partners on 30 March ...

ادامه مطلب

Careers | MODEC

Careers. MODEC is an owner/operator and EPCI (Engineering, Procurement, Construction and Installation) general contractor of floating production systems including Floating Production Storage and Offloading (FPSO) units, Floating Storage and Offloading (FSO) units, FLNGs, Tension Leg Platforms (TLPs) and Semi-Submersibles.

ادامه مطلب

FPSO Cidade de Niterói MV18 | Projects | MODEC

The FPSO is operated in the Marlim Leste oil field which lies within the Campos Basin, offshore Brazil since February 2009. MODEC carried out the engineering, procurement, construction, installation and commissioning of the FPSO which is capable of processing 100,000 barrels of crude oil per day, 124 million standard cubic feet of gas per day and …

ادامه مطلب

FPSO Ruby Princess | Projects | MODEC

The FPSO Ruby Princess is operating in the Ruby field located in Blocks 01 & 02 offshore Vietnam, approximately 155 km northeast of Vung Tau. MODEC was the Operations and Maintenance contractor to the FPSO …

ادامه مطلب

FPSO MIAMTE MV34 | Projects | MODEC

FPSO MIAMTE MV34. The FPSO is operating in the Offshore Area 1 block in the Gulf of Mexico. This is MODEC's first project for Eni Mexico, a subsidiary of the integrated energy company Eni. MODEC was appointed by Eni Mexico for the supply, charter and operations of the FPSO in the Eni-operated Offshore Area 1 block in the Bay of Campeche in ...

ادامه مطلب

New Ventures and Technology | BW Offshore

Hydrogen and Ammonia are forecasted to enable significant emissions reductions in power, transportation, and heating sectors. In 2022, BW Offshore commenced Proof of Concept phase for an Offshore Green Ammonia FPSO powered by floating wind. In parallel, we are developing concepts for nearshore green ammonia, and monitoring …

ادامه مطلب

BW Offshore locks in Chinese yard for Brazil-bound FPSO

Singapore. Oslo-listed floater specialist BW Offshore has locked in a Chinese yard for the engineering, procurement and construction for the hull of the floating production, storage and offloading ...

ادامه مطلب

FPSO | Business | MODEC

FPSO. MODEC is an owner/operator and EPCI (Engineering, Procurement, Construction and Installation) general contractor of floating production systems including Floating Production Storage and Offloading (FPSO) units, Floating Storage and Offloading (FSO) units, FLNGs, Tension Leg Platforms (TLPs) and Semi-Submersibles.

ادامه مطلب

FPSO/FSO | Floating Production Systems | FPSO Business

FPSO and FSO systems are the primary method for many offshore oil and gas producing regions around the world. Most FPSOs/FSOs are ship-shaped and can be secured to …

ادامه مطلب

FPSO | Business | MODEC

Business. FPSO. MODEC performs EPCI activities for FPSOs and other floating oil and gas production facilities. Further, by owning and operating its own floating production …

ادامه مطلب